DNS Record Lookup
Look up DNS records including A, AAAA, MX, NS, SOA, CNAME, TXT, and CAA records for any domain
Hosting & Network
mmsproject.com runs on AS29066, with email via Google Workspace.
- Hosting network
- AS29066AS29066
- Managed DNS
- Self-hosted / other
- Google Workspace
- IPv6 (AAAA)
- Not enabled
- CAA pinning
- None
Sits alongside 14,404 other sites on AS29066. Stable here since we started watching (Sep 14, 2026).
The apex and www are the same hosting — the apex via A records, www via a CNAME to mmsproject.com.
DNS Records for mmsproject.com
| Hostname | Type | TTL | Priority | Content |
|---|---|---|---|---|
| mmsproject.com | SOA | 10800 | ns1.supersistemweb.com zulal.sakaryarehberim.com 2026082801 10800 3600 1209600 10800 | |
| mmsproject.com | A | 0 | 188.138.41.151 | |
| mmsproject.com | TXT | 0 | v=spf1 include:_spf.google.com ~all | |
| mmsproject.com | TXT | 0 | google-site-verification=QEsdPmm51vfuG_GWJJOzKI9D5Kc0flhzLPhvBil7CMg | |
| mmsproject.com | MX | 0 | 1 | smtp.google.com |
| mmsproject.com | NS | 0 | ns1.supersistemweb.com | |
| mmsproject.com | NS | 0 | ns2.supersistemweb.com | |
| www.mmsproject.com | SOA | 10800 | ns1.supersistemweb.com zulal.sakaryarehberim.com 2026082801 10800 3600 1209600 10800 | |
| www.mmsproject.com | MX | 0 | 1 | smtp.google.com |
| www.mmsproject.com | TXT | 0 | v=spf1 include:_spf.google.com ~all | |
| www.mmsproject.com | TXT | 0 | google-site-verification=QEsdPmm51vfuG_GWJJOzKI9D5Kc0flhzLPhvBil7CMg | |
| www.mmsproject.com | NS | 0 | ns2.supersistemweb.com | |
| www.mmsproject.com | NS | 0 | ns1.supersistemweb.com | |
| www.mmsproject.com | CNAME | 0 | mmsproject.com | |
| www.mmsproject.com | A | 0 | 188.138.41.151 |
Get alerted the moment mmsproject.com's DNS changes
This page is today's snapshot. Turn on monitoring and we'll watch mmsproject.com continuously, notifying you the moment anything moves across all three signals:
Uptime
We visit the site from multiple regions worldwide and email you within minutes if it goes down, with a per-region breakdown so a real outage stands out from a regional blip.
DNS changes
We watch NS, MX, CAA, DNSSEC, CNAME and A/AAAA records, and identify the host, network, and ASN behind them, so a real migration or hijack stands out from routine noise.
TLS certificate
We warn you 30, 14, 7, and 1 days before it expires, and flag it if the issuing authority changes or the certificate is unexpectedly replaced.
Free for your first domain: uptime, DNS, and certificate together. No credit card.
What's up with DNS →
Our daily roundup of the most interesting DNS changes across the web — hosting and CDN migrations, network moves, and security-config shifts.
Ask about mmsproject.com
BetaAnswers use the live DNS records shown on this page. AI-generated — double-check anything important.
About DNS Records
DNS (Domain Name System) records are instructions that provide information about a domain, including its IP addresses, mail servers, and other services. Common record types include:
- SOA (Start of Authority) - Contains administrative information about the zone
- NS (Nameserver) - Specifies authoritative nameservers for the domain
- A (Address) - Maps a domain to an IPv4 address
- AAAA - Maps a domain to an IPv6 address
- CNAME (Canonical Name) - Creates an alias pointing to another domain
- MX (Mail Exchange) - Specifies mail servers for the domain